Done on Winnebago so far:

– Make and mount storm windows
– Install insulation in rear room
– Replace dual battery relay switch
– Install and wire up two 125AH deep cycle batteries in parallel
– Fix up-down table by installing new wall panel
– Rebuild furnace blower motor and test furnace and thermostat
– Level unit and power fridge up
– Get Onan 4kw generator running

Still to do:

– Test toilet seals
– Test gas tank switch
– Oil change, new air filter, and fluids check
– Winterize water system
– Get fridge running on propane
– Clean the damn thing
– Have power steering gearbox rebuilt to fix wander
– Repaint interior
– Caulk exterior
– Call owner and ask about gotchas